Red Talks

Episode 11: Digital Transformation: Power, Water, Labor — The Real Limits of Digital Expansion

• IRISS Inc • Episode 11

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 8:31

AI runs on infrastructure most people never think about. Mike Doolan pulls back the curtain on what actually constrains data center growth, from gigawatt-scale power loads to the labor and water demands behind the racks. His take: human error, not hardware, remains the biggest threat to uptime, and no amount of cutting-edge tech fixes that without careful planning.

In this episode:

  • The physical infrastructure limits behind AI and data center growth
  • How data centers plan for gigawatt-scale power loads and beyond
  • Why human error remains the biggest threat to uptime

More about Red Talks: https://redtalk.com

Follow us on YouTube: https://www.youtube.com/@OfficialREDTalks